Instant Gas Geyser Home Appliances > Water Heaters > Gas Water Heaters

(0 reviews)
Estimate Shipping Time: 3 Days

Sold by:
Inhouse product

Price:
₮39.00 /Pc

Quantity:
(4543 available)

Total Price:
Refund:
Share:
Products Description
 Model No.:
Exhaust Way: Flue Type Machine Installation Type: Wall Mounted Ignition Mode: Automatic Plus Ignition Gas type:LPG/NG
Rated gas pressure(Pa): LPG: 2800Pa / NG:2000Pa
Water pressure(MPa): 0.006-0.85MPa FUNCTIONS:
Flameout Safety Device Over Heat Protection Anti-freezing Device
Over Water Pressure Protection
Winter-summer Switch Optional For Energy Saving
20 Minutes Timer Is Optional
Different Colors Is Optional
LCD Display Is Optional Optional
H TYPE CABINET
Capacity (Liter)
5L
6L
7L
8L
10L
12L
Product Size (mm)
440x285x120
440x300x120
490x310x120
520x320x140
590x340x140
620x340x140
Packing Size (mm)
560x335x170
560x350x170
562x365x180
613x377x192
715x400x210
715x400x210
Loading 40'HQ
2150 PCS
2050 PCS
2050 PCS
1550 PCS
1150 PCS
1150 PCS
F TYPE CABINET
Capacity (Liter)
6L
8L
10L
12L
16L
20L
Product Size (mm)
440x300x130
500x300x150
585x330x180
620x330x180
650x420x180
700x420x180
Packing Size (mm)
550x340x185
610x360x200
710x400x210
750x410x210
770x460x210
820x460x210
Loading 40'HQ
2050 PCS
1550 PCS
1170 PCS
1050 PCS
920 PCS
840 PCS
Certifications

OUR CERTIFICATES

Delivery
Company Profile
    Our Workshop                                           //////////// 
Punching Workshop
  Hydraulic Pressing
Hardware Punching
Point Welding
Argon arc welding
Drilling
    ASSEMBLY                                                //////////// 
GAS STOVE ASSEMBLY
GAS COOKER ASSEMBLY
RANGE HOOD ASSEMBLY

GAS WATER HEATER ASSEMBLY


ELECTRIC WATER HEATER ASSEMBLY


    TESTING                                                    //////////// 
Gas Water Heater Testing
Gas Leakage Testing
Gas Cooker Fire Testing
Income Material Quaulity Checking
Gas Leakage Testing
Water Leakage Testing
    WAREHOUSE                                            //////////// 
Ready To Ship Warehouse
                  Delivery       warehouse          
Hareware Materials Warehouse
Product Packaging
FAQ
  Q   Are you trading company or manufacturer ?
  A   We are factory with nearly 10 years home appliances manufacturing experience. 

  Q   How long will it take for the mass production?
  A   For first order, it is 35-40 days. For repeat order, it is 25-30 days.

  Q   Can you do SKD or CKD ?
  A   Yes, sure. We have been doing SKD/CKD business with customers in Asia and South America.

  Q    Can I get samples?
  A   Yes, sample lead time is about 7-10 days. Please further discuss with sales.

  Q    What is your terms of delivery?
  A   We can generally do EXW, FOB, CNF and CIF terms. You can choose one of them which is the most suitable       for you.

  Q   What is your terms of payment ?
  A   We can do T/T, or L/C at sight, or D/P. It is to be further discussion for details. 

Recommend Products
There have been no reviews for this product yet.

Product Queries (0)

Login or Registerto submit your questions to seller

Other Questions

No none asked to seller yet